The short answer
Industrial proposals can use annual per-foot, monthly per-foot, or total monthly figures. Normalize the rent, then keep utilities, CAM, power, racking, moving, and build-out as separate entered items.
Worked exampleA total monthly quote should be converted using the proposal’s rentable area before comparing it with a $/SF/year quote.
Common mistakes
- Using a gross assumption
- Hiding operational equipment costs
Limitations
No local warehouse rate is inferred.
Use the assumption in context
Start with the relevant tool, preserve the source input, and keep the result alongside the proposal or budget it describes. A calculated result is only as reliable as the assumption and period entered.