The short answer
A tenant-side NNN budget should show base rent and each entered additional-rent estimate, such as taxes, insurance, and CAM. The result is a planning estimate; reconciliation, exclusions, caps, and audit rights are separate questions.
Worked exampleA $24/SF base plus $8/SF additional rent on 3,000 SF produces $8,000 monthly before concessions and other costs.
Common mistakes
- Calling estimated NNN a final bill
- Hiding the components in one total
Limitations
No expense reconciliation or clause interpretation is performed.
Use the assumption in context
Start with the relevant tool, preserve the source input, and keep the result alongside the proposal or budget it describes. A calculated result is only as reliable as the assumption and period entered.