Build-out

TI reimbursement timing and opening cash

Why does reimbursement timing change the answer?

The short answer

A reimbursement received later cannot fund opening cash unless the business has bridge funding. LeaseCostbook places the inflow on the entered month and reports peak cumulative funding.

Worked exampleA $125,000 reimbursement in month four remains part of the opening funding requirement if the build-out is paid before then.

Common mistakes

  • Netting a future reimbursement at opening
  • Assuming approval equals payment

Limitations

Actual payment timing depends on the proposal and work completion.

Use the assumption in context

Start with the relevant tool, preserve the source input, and keep the result alongside the proposal or budget it describes. A calculated result is only as reliable as the assumption and period entered.

Open the related calculator ↗