The short answer
Check units, area, term, escalations, expenses, concessions, TI timing, deposit, opening items, horizon, discount rate, and source notes. Reconcile displayed totals to the schedule before printing.
Worked exampleUse the report assumptions panel as a checklist instead of relying on memory.
Common mistakes
- Omitting source notes
- Sharing a report with optional costs hidden
Limitations
A checklist cannot validate legal terms.
Use the assumption in context
Start with the relevant tool, preserve the source input, and keep the result alongside the proposal or budget it describes. A calculated result is only as reliable as the assumption and period entered.