The short answer
Not fairly without labeling the horizon. Use a common modeled period for comparison, then show the original term totals and any renewal assumption separately. Never silently extend a proposal.
Worked exampleCompare both offers over 36 entered months, while showing that one proposal has a 60-month initial term.
Common mistakes
- Silently assuming renewal
- Calling a shorter total cheaper
Limitations
A common horizon is a planning convention, not a contractual extension.
Use the assumption in context
Start with the relevant tool, preserve the source input, and keep the result alongside the proposal or budget it describes. A calculated result is only as reliable as the assumption and period entered.