The short answer
The common errors are unit mismatch, area mismatch, omitted additional rent, free-rent overreach, TI timing, deposit classification, unequal horizons, and hidden one-time costs. A connected schedule makes each one inspectable.
Worked exampleA proposal can look $2/SF cheaper and become more expensive after a different area basis and CAM estimate are normalized.
Common mistakes
- Trusting a single effective rate
- Leaving the source unit unstated
Limitations
This list is a review aid, not a substitute for proposal review.
Use the assumption in context
Start with the relevant tool, preserve the source input, and keep the result alongside the proposal or budget it describes. A calculated result is only as reliable as the assumption and period entered.