The short answer
Moving budgets can include labor, temporary storage, IT, signage, furniture, permits, equipment transport, and an entered contingency. Keep them outside lease rent so the report explains the source of opening cash.
Worked exampleA small office move may need an IT cutover and temporary storage line even when the lease comparison looks complete.
Common mistakes
- Putting moving into base rent
- Leaving temporary overlap out
Limitations
No moving vendor price is generated.
Use the assumption in context
Start with the relevant tool, preserve the source input, and keep the result alongside the proposal or budget it describes. A calculated result is only as reliable as the assumption and period entered.