Build-out

Building a commercial build-out budget

What should be in a build-out budget?

The short answer

Start with the entered construction scope, then add design, permits, equipment, signage, technology, moving, and a clearly labeled contingency if those items are relevant. Keep lease-funded amounts separate from tenant-funded amounts.

Worked exampleA $50/SF construction estimate can be only one line in a restaurant opening budget; equipment and ventilation may be entered separately.

Common mistakes

  • Putting all opening costs into rent
  • Hiding contingency

Limitations

No construction estimate is generated from property type.

Use the assumption in context

Start with the relevant tool, preserve the source input, and keep the result alongside the proposal or budget it describes. A calculated result is only as reliable as the assumption and period entered.